Step
1: |
Select "To take charge of installations by voltage levels" |
|
|
|
Step
2: |
Enter
the Period of stand-in, the Reason for stand-in and the required
particulars. |
|
Step
3: |
Scroll down the form page and enter the licence no. of the Authorized
Stand-in LEW for each voltage rating. Make sure that the checkbox
beside each rating is checked. |
|
Step
4: |
Click
on the declaration notes and then "Next". |
|
|
Step
5: |
Verify
and confirm on the details of the Stand-in Arrangement. Click
"Confirm" to submit the application. |
|
|
|
|
|
Step
6: |
Take
note of the reference number generated for future reference.
Click "reference no.", if you wish to view the Stand-in
Arrangement details. |
|
|
|
|
|
Step
7: |
Click
on the link to see arrangement details. |
|
|
|
|
|
|
|
|